ADR 0057: A Flow step's due time withdraws its task

Status: accepted, 16 Oct 2026 · Workstream: flows · Roadmap 0.6, item 3.

Context

An agent or task step waits for its task. Without a due time a late agent could finish work after the Flow moved on, and a session could keep working for nothing. The task table had no way to end a task that is being worked on: working led only to done, needs_check or stuck, and skipped was a person's act from ready or stuck.

Decision

  1. One new transition, flow_deadline. ready, working, needs_check and stuck may go to skipped by flow_deadline. There is no new state: skipped is already terminal. The task carries withdrawn: { reason: "timeout", at }, and the log gets task.withdrawn.
  2. Only the Flows service withdraws. The action tasks.withdraw is in the Flows manifest and in no role. The kernel also checks that the chain's acting hop is the Flows service. An agent, a member's MCP key and any other module are refused.
  3. One write ends it. The state change is a single write. From then on every start, hand-in, move, check and reopen is refused (bad_state), so the agent's lent right on the task has nothing left to act on. The rest follows from the durable task.withdrawn event and each step is safe to repeat: the lend of the task is ended, the agent's session for it is stopped, what the session held for a yes (approvals cards and Gate drafts) is discarded with the reason in words, and then the Flow's failure steps run. A crash between any two of them is finished on resume.
  4. Never reopened. TASK_REOPENS refuses a withdrawn task. A person who still wants the work gives a new task.
  5. Stage tasks follow the same path. A required stage task that is withdrawn stays required: tasks that depend on it keep waiting.

Consequences

  • A Flow author sets a due time on an agent or task step (timeout_ms, default for an agent from the Space). Past it the step fails with timeout and runs its own nested steps.
  • The task shows as skipped with the reason "the due time passed". The Needs you list and the run page say so in words.
  • A client store never offers flow_deadline as a button.